CR: 7026934831 | Saudi Contractors Authority Member
— CAPABILITY

Water Networks

Installation and maintenance of water distribution networks, storage towers, and well drilling per Ministry of Environment, Water and Agriculture requirements.

— SNAPSHOT
Projects delivered +20
Kilometers laid +45
Wells completed +25
— SCOPE OF WORK

Service Scope

— 01

Distribution Networks

HDPE and ductile iron pipe networks in various diameters.

— 02

Storage Towers

Ground and elevated water tank construction.

— 03

Wells

Drilling, equipping, and maintenance of artesian wells.

— 04

Pumping Stations

Pump station installation and commissioning.

— EXECUTION PROCESS

Execution Stages

Documented methodology from initial site survey to final handover.

01

Site Study

Site survey and routing

02

Excavation

Trenching and excavation

03

Laying

Pipe laying and joints

04

Testing

Pressure and leak testing

05

Commissioning

Trial run and handover

Water Networks — Ready to Execute

Detailed proposal within 48 business hours.

Talk to the team WhatsApp